B.E COMP A,B & C

Sr No Duration Work to be Done
01 Week 1 Project Title finalisation
02 Week 2 Refinement of Literature Survey: papers/Web, Gap identification, Current systems Vs. Existing systems, Refining Problem Definition, Objectives of the system, Scope of the system, Architecture Design and Algorithms/ Flowchart and Expected Results
03 Week 3 Project Planning Document: (Gantt Chart), Requirements Analysis Document (RAD) refinement, Technical Feasibility study, Financial Feasibility study, Market Survey, Legal Survey, Society Survey
04 Week 4 Presentation I and Evaluation based on Planning, Literature Survey, Architectecure and Algorithms/ Flowchart, methodology used, parameters for performance evaluation, software and hardware set up, Implementation Results (25-30%)
05 Week 5 System Analysis Document(SAD): Form a functional model(DFD), Structural Model and Behavioral Model. Design Document(DD): Database Design, Data structure design, Refined Software architecture design, Deviding project into six modules.
06 Week 6 30-40% implementation (presentation to the guide)
07 Week 7 40-50% implementation (presentation to the guide)
08 Week 8 ISE-I
09 Week 9 Presentation II and Evaluation based on 50-60% implementation
10 Week 10 First draft of paper for submission in quality journal (SCIE,SCI,WoS)
11 Week 11 Submission of draft of Final research paper
12 Week 12 First draft of Blue book
13 Week 13 Presentation III and Evaluation based on 60-70% Implementation
14 Week 14 Blue book Submission to the respective Guides
15 Week 15 Submission of Project Report( Part I) (Duly signed by Guide and HOD)